- IBM i CPW per LPAR
- 118,200
- Four-core IBM i partition limit
- IBM i tier
- P10
- IBM i I/O through VIOS
- Physical cores
- 20
- Two sockets, eSCM modules
- Clock
- 3.05 to 4.0 GHz
- AIX rPerf 626.7 at SMT8
On this page
Power 11 S1122 ERGQ 20-core processor specifications
| Specification | Configuration |
|---|---|
| Catalog model | 9824-22A-ERGQ-20CORE |
| Machine type and model | 9824-22A |
| Processor feature | ERGQ |
| Physical cores | 20 |
| Sockets | 2 |
| Processor arrangement | Two ten-core eSCM modules |
| Clock range | 3.05 to 4.0 GHz |
| IBM i software tier | P10 |
| Cache per core | 2 MB L2; 8 MB L3 |
S1122 ERGQ 20-core IBM i capacity and I/O
| IBM i requirement | Configuration |
|---|---|
| Maximum cores per LPAR | 4 |
| Maximum CPW per LPAR | 118,200 |
| I/O | Virtualized through Virtual I/O Server (VIOS) |
| Partition setting | Restricted I/O |
| Software tier | P10 |
The 20 physical cores describe the system, not the size of one IBM i logical partition (LPAR). Use the additional cores across the required IBM i, AIX, Linux, and VIOS partitions.
Choose ERGR four-core or ERGR eight-core if native IBM i I/O is required.
S1122 ERGQ 20-core CPW per core
CPW per core is the CPW rating divided by the cores that deliver it. IBM i is licensed by core, so this number shows how much IBM i work you get from each licensed core. On this model each IBM i partition is limited to four cores, so the figure is the partition rating divided by four.
| Configuration | Cores counted | CPW | CPW per core |
|---|---|---|---|
| ERGQ 20-core | Four cores per IBM i LPAR | 118,200 | 29,550 |
The configuration CPW references differ: 123,400 in the processor-options table and 124,500 in the overview. Neither replaces the four-core, 118,200 CPW IBM i partition limit above.
S1122 ERGQ 20-core AIX performance (rPerf)
rPerf is the relative performance rating for AIX workloads. ST is single-thread. SMT2, SMT4, and SMT8 show the rating with two, four, or eight hardware threads running on each core.
| Configuration | ST | SMT2 | SMT4 | SMT8 |
|---|---|---|---|---|
| ERGQ 20-core, two sockets | 173.2 | 338.1 | 482.8 | 626.7 |
These rPerf ratings describe the complete twenty-core, two-socket configuration. They are not ratings for one four-core IBM i partition.
S1122 memory and storage
| Specification | Configuration |
|---|---|
| Memory | 64 GB to 4 TB across 32 DDR5 DDIMM slots |
| Internal bays | Eight U.2 NVMe bays |
| Mainstream NVMe maximum | 122.4 TB raw, eight 15.3 TB modules |
| Enterprise NVMe maximum | 51.2 TB raw, eight 6.4 TB modules |
| NVMe expansion | One NED24 drawer with 24 U.2 bays |
Storage maxima are raw capacity, not usable capacity after mirroring or other protection.
S1122 ERGQ 20-core I/O and physical specifications
| Specification | Configuration |
|---|---|
| Chassis | 2U rack |
| Processor-dependent PCIe | Gen4 operation with eSCM |
| CEC slot topology | Four Gen4 x16 slots in the first slot group; four Gen5 x8 slots with x16 connectors; two Gen4 x8 slots with x16 connectors. eSCM operation is listed at Gen4 speeds |
| PCIe expansion | One Gen4 I/O drawer; 12 slots |
| Width x depth x height | 18.97 x 32 x 3.4 in. (482 x 813 x 86.5 mm) |
| Weight | 71 lb (32.2 kg) |
S1122 management and availability
- Chipkill memory and active memory mirroring.
- Redundant hot-plug power and cooling.
- eBMC management, processor instruction retry, and dynamic processor deallocation.
- PowerVM Enterprise Edition with optional dual VIOS.
- Capacity Upgrade on Demand (CUoD) and Power Private Cloud EP2.0.
- Up to 1,000 logical partitions or micro-partitions across the system.
S1122 software and management requirements
Match the installed OS release and I/O arrangement to the selected processor feature. HMC v11 requires a 7063-CR2 appliance or virtual HMC; the 7063-CR1 cannot manage Power 11.
| Software | Levels |
|---|---|
| IBM i | 7.6 with Power 11 GA PTF group; 7.5 TR6 or later; 7.4 TR12 or later. Apply this model's partition and I/O restrictions. |
| AIX with any I/O | 7.3 TL03 / SP 7300-03-01-2520; 7.2 TL05 / SP 7200-05-10-2520; or 7.3 TL02 / SP 7300-02-04-2520, or later. |
| AIX virtual-I/O-only partitions | 7.3 TL03 / SP 7300-03-00-2446; 7.3 TL02 / SP 7300-02-02-2420; or 7.2 TL05 / SP 7200-05-08-2420, or later. |
| VIOS | 4.1.1.10, 4.1.0.40, or 3.1.4.60, or later. |
| Linux | RHEL 8.10, RHEL 9.4, or RHEL 10.0 or later; RHEL for SAP 9.6 or later; SLES 15 SP6 or later, including SLES for SAP. |
| Red Hat OpenShift | Container Platform 4.19 or later. |
| Hardware Management Console | HMC v11 using 7063-CR2 or virtual HMC. 7063-CR1 does not support Power 11 management. |
Compare S1122 ERGQ 20-core configurations
The 10-core ERGQ uses one socket at the same clock range. This 20-core configuration adds a second module for the overall workload; it does not enlarge an individual IBM i partition beyond four cores.
S1122 ERGQ 10-core specifications | S1122 EBG9 24-core specifications | All S1122 processor options
IBM Power 11 S1122 9824-22A ERGQ 20-core feature and configuration details
Use these entries to match the chart’s identifiers to their exact configuration. Keep each performance figure with its stated core count, threading mode and model scope.
ERGQ 20-core ... 9824-22A
S1122 ERGQ 20-core CPW per core
- Cores counted
- Four cores per IBM i LPAR
- CPW
- 118,200
- CPW per core
- 29,550
Understand this configuration and identifier before matching a replacement. Send the complete model and ERGQ 20-core entry with your configuration or parts request.
ERGQ 20-core, two sockets ... 9824-22A
S1122 ERGQ 20-core AIX rPerf by thread mode
- ST
- 173.2
- SMT2
- 338.1
- SMT4
- 482.8
- SMT8
- 626.7
Understand this configuration and identifier before matching a replacement. Send the complete model and ERGQ 20-core, two sockets entry with your configuration or parts request.
Request a S1122 ERGQ 20-core quote
Send us your partition layout, operating-system releases, and required memory. Include usable storage capacity and the adapters you need.
For an MES upgrade, include your current machine type, model, and serial number.
We can include the services needed to bring the configured system into production:
- Installation and operating-system upgrades.
- Data migration and PTF updates.
- Ongoing maintenance and support.