AS400 to IBM Power 11 Partners
(888) 682-5335

Power 6 AIX upgrades by current model

What can your Power 6 AIX system move to?

Compare OS and capacity changes for your Power 6 AIX workload. Start with the exact model and installed release so Midland can scope an upgrade or a suitable replacement.

Your current Power 6 model and AIX workload

Eligible Power 6 systems can run AIX 7.1, but not AIX 7.2 or 7.3. Keep firmware and the exact edition in the assessment.

Choose the exact catalog identity below for its planning notes. The list identifies assessment starting points; eligibility still depends on the installed edition and configuration.

Power 6 AIX model planning
Current modelConfiguration question
520 8203-E4AMatch the capacity change to the actual bottleneck
520 9407-M15Match the capacity change to the actual bottleneck
520 9408-M25Match the capacity change to the actual bottleneck
550 8204-E8AMatch the capacity change to the actual bottleneck
550 9409-M50Match the capacity change to the actual bottleneck
560 8234-EMAMatch the capacity change to the actual bottleneck
570 9117-MMASize each partition and its storage connections
570 9406-MMASize each partition and its storage connections
575 9125-F2APlan the compute fabric and application together
595 9119-FHASize each partition and its storage connections
JS12 7998-60XReplace chassis dependencies along with the workload
JS22 7998-61XReplace chassis dependencies along with the workload
JS23 7778-23XReplace chassis dependencies along with the workload
JS43 7778-23XReplace chassis dependencies along with the workload
Smart Cube 8261-E4SMatch the capacity change to the actual bottleneck

520 8203-E4A: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

The catalog’s storage and I/O context is Six 3.5-inch or eight SFF SAS drives; three PCIe and two PCI-X slots. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

520 8203-E4A catalog details · Choose the installed-release branch · Prepare the migration inventory

520 9407-M15: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

The catalog’s storage and I/O context is Six internal SAS drive positions; five system I/O slots. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

520 9407-M15 catalog details · Choose the installed-release branch · Prepare the migration inventory

520 9408-M25: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

The catalog’s storage and I/O context is Six internal SAS drive positions; five system I/O slots. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

520 9408-M25 catalog details · Choose the installed-release branch · Prepare the migration inventory

550 8204-E8A: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

The catalog’s storage and I/O context is Six 3.5-inch or eight SFF SAS bays; three PCIe and two PCI-X slots. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

550 8204-E8A catalog details · Choose the installed-release branch · Prepare the migration inventory

550 9409-M50: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

The catalog’s storage and I/O context is Six 3.5-inch or eight SFF SAS bays; five system I/O slots. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

550 9409-M50 catalog details · Choose the installed-release branch · Prepare the migration inventory

560 8234-EMA: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

The catalog’s storage and I/O context is Six 3.5-inch SAS bays per enclosure; up to twelve PCI slots across two enclosures. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

560 8234-EMA catalog details · Choose the installed-release branch · Prepare the migration inventory

570 9117-MMA: size each partition and its storage connections

Capture the busy periods and resource allocation for each logical partition. Review external storage, multipath software and management-console levels. A consolidation plan must retain the isolation and recovery behavior the applications need.

The catalog’s storage and I/O context is Six 3.5-inch SAS bays per enclosure; external RIO/12X I/O drawers. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review E1050 9043-MRX and E1150 9043-MRU. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

570 9117-MMA catalog details · Choose the installed-release branch · Prepare the migration inventory

570 9406-MMA: size each partition and its storage connections

Capture the busy periods and resource allocation for each logical partition. Review external storage, multipath software and management-console levels. A consolidation plan must retain the isolation and recovery behavior the applications need.

The catalog’s storage and I/O context is Six internal SAS bays per enclosure; RIO/12X expansion is configuration dependent. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review E1050 9043-MRX and E1150 9043-MRU. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

570 9406-MMA catalog details · Choose the installed-release branch · Prepare the migration inventory

575 9125-F2A: plan the compute fabric and application together

Capture the cluster fabric, scheduler and storage layout. Record cooling and rack dependencies with the current system. The application’s scale-out behavior and recovery design matter as much as a processor comparison.

The catalog’s storage and I/O context is Two internal SFF SAS positions; four PCIe slots per node. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review E1050 9043-MRX and E1150 9043-MRU. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

575 9125-F2A catalog details · Choose the installed-release branch · Prepare the migration inventory

595 9119-FHA: size each partition and its storage connections

Capture the busy periods and resource allocation for each logical partition. Review external storage, multipath software and management-console levels. A consolidation plan must retain the isolation and recovery behavior the applications need.

The catalog’s storage and I/O context is Drives and PCI adapters reside in attached 19-inch or 24-inch I/O drawers. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review E1050 9043-MRX and E1150 9043-MRU. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

595 9119-FHA catalog details · Choose the installed-release branch · Prepare the migration inventory

JS12 7998-60X: replace chassis dependencies along with the workload

Include the BladeCenter or Flex chassis and shared networking in the inventory. Record the actual virtual-I/O provider and storage mappings. Moving the workload to a rack server also means replacing the services supplied by the chassis.

The catalog’s storage and I/O context is Two local SAS drive positions; chassis-connected expansion cards. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

JS12 7998-60X catalog details · Choose the installed-release branch · Prepare the migration inventory

JS22 7998-61X: replace chassis dependencies along with the workload

Include the BladeCenter or Flex chassis and shared networking in the inventory. Record the actual virtual-I/O provider and storage mappings. Moving the workload to a rack server also means replacing the services supplied by the chassis.

The catalog’s storage and I/O context is One local SAS drive positions; chassis-connected expansion cards. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

JS22 7998-61X catalog details · Choose the installed-release branch · Prepare the migration inventory

JS23 7778-23X: replace chassis dependencies along with the workload

Include the BladeCenter or Flex chassis and shared networking in the inventory. Record the actual virtual-I/O provider and storage mappings. Moving the workload to a rack server also means replacing the services supplied by the chassis.

The catalog’s storage and I/O context is One local SAS drive positions; chassis-connected expansion cards. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

JS23 7778-23X catalog details · Choose the installed-release branch · Prepare the migration inventory

JS43 7778-23X: replace chassis dependencies along with the workload

Include the BladeCenter or Flex chassis and shared networking in the inventory. Record the actual virtual-I/O provider and storage mappings. Moving the workload to a rack server also means replacing the services supplied by the chassis.

The catalog’s storage and I/O context is Two local SAS drive positions; chassis-connected expansion cards. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

JS43 7778-23X catalog details · Choose the installed-release branch · Prepare the migration inventory

Smart Cube 8261-E4S: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

The catalog’s storage and I/O context is Shared 520 service family has 3.5-inch and SFF SAS backplanes; identify the installed one. Check the installed adapters and recovery devices against the destination; their presence on the source does not establish reuse eligibility.

For a 7.2 or 7.3 OS goal, include different hardware in the sequence. Keep a usable backup of the original root volume group before changing the software.

For a replacement comparison, review S1022 9105-22A and S1122 9824-22A. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

Smart Cube 8261-E4S catalog details · Choose the installed-release branch · Prepare the migration inventory

Your installed AIX release on Power 6

Separate the software work from a move to newer hardware. If the desired AIX release cannot boot on Power 6, the plan needs a compatible destination or intermediate environment.

Power 6: AIX release starting points
Installed release or architecturePlanning next step
AIX 5.3 / 6.1 and earlierReview the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.
AIX 7.1Review the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.

Find the installed release information.

Upgrade AIX or add capacity on Power 6

Start with the application result you need. A supported OS change can keep the existing server useful; a capacity change can address resource pressure. Neither establishes a supported release on hardware the vendor excludes.

Migration from your Power 6 AIX system

Moving to another server is a separate task from updating the OS. The plan must qualify the destination, transfer the workload and prove the application works before the final switch.

  1. Record the source configuration.
  2. Choose a compatible transfer method.
  3. Rehearse application recovery and acceptance.
  4. Agree the rollback decision before new production transactions begin.

Return to AIX upgrades · Plan the AIX migration

Sources and release checks

Guidance checked October 21, 2026. Midland catalog identities stay with their exact model. Hardware eligibility, software maintenance and application certification need separate checks for the installed configuration.