AS400 to IBM Power 11 Partners
(888) 682-5335

VMware workloads to IBM Power migration

Assess each guest before moving the workload

Sort VMware guests by OS and application so you can see which workloads fit Power. Rebuild eligible services and plan a separate destination for x86-only software.

Inventory the workload inside each VMware guest

A VMware cluster is a hosting environment, not one application. List every VM’s OS and release, database, application owner, data volumes, backup method and connections. Include templates, powered-off guests needed for recovery and services outside the cluster.

VMware guest decisions for Power
Guest workloadAssessment guide
Linux application guestCheck the distribution and availability of Power application builds.
Windows application guestSeparate portable services from Windows-only components.
SAP HANA database guestQualify the HANA revision, Linux combination and Power configuration.
Oracle database guestChoose a certified target platform and documented data-transfer method.
Vendor appliance or x86-only guestAsk the supplier for a supported Power edition or retain another qualified platform.

A virtual disk transfer does not convert the application

An x86 guest expects x86 instructions and its source virtual devices. Exporting an appliance or copying a VMDK does not create a Power boot environment. Plan a supported OS installation and application deployment on the target, then transfer application data through a qualified method.

PowerVM and other Power virtualization choices have their own supported OS and model requirements. Confirm the Power Linux release and virtualization combination or AIX target requirements after qualifying the software.

Treat packaged appliances as vendor products

A firewall, backup, monitoring or application appliance may bundle an x86-only OS and locked software. Obtain the supplier’s explicit target options rather than unpacking the appliance and assuming a port. Retain it on an approved platform or select a supported replacement if no Power edition exists.

Recreate VMware-dependent operations for the new workload

VMware operations that need a target design
Existing capabilityWhat the conversion must prove
Backup and restoreRecover the new OS, application and data; a source VM snapshot is not the target backup plan.
High availability and restart automationReplace required service behavior with qualified target mechanisms.
Networking, addresses and external servicesTest load balancers, names, certificates and retained x86 dependencies.
Capacity and licensingUse measured demand and target software terms instead of a vCPU-to-core ratio.

Migrate application groups instead of isolated VM files

Schedule tightly connected application and database tiers together or test the temporary split. Define the system that owns writes during each stage. Rehearse business transactions and restore recovery before retiring source guests.

After an eligible workload is operating on Power, later Power capacity and OS changes belong in Upgrades. The initial x86 conversion remains part of Migration.

Plan the Power destination with Midland

Use the assessment to decide which workload belongs on Power before comparing hardware. Midland’s Power model catalog supplies the server identities; software eligibility and measured workload demand decide the configuration.

Prepare the conversion inventory and Bring your current OS, application and database versions to Midland.

Sources and release checks

Technical guidance checked October 21, 2026. Confirm the exact application edition, OS release and target architecture with its vendor before ordering. Older technical papers explain migration methods; they do not establish current certification.