AS400 to IBM Power 11 Partners
(888) 682-5335

IBM Power 10 S1012 EPG7 4-core

S1012 EPG7 4-core Power 10 configuration

The S1012 EPG7 gives IBM i 111,300 CPW from four cores in the P05 tier, as a tower or a half-wide 2U rack system. Request a quote for your partitions, memory, and storage.

IBM i CPW
111,300
27,825 per core; we confirm the rating with your quote
IBM i tier
P05
Software licensing tier
Physical cores
4
One socket, 3.0 to 3.9 GHz
AIX rPerf
130.4
SMT8
On this page

Power 10 S1012 EPG7 4-core processor specifications

IBM S1012 EPG7 4-core processor specifications
SpecificationConfiguration
Catalog modelS1012-9028-21B-EPG7
Machine type and model9028-21B
Processor featureEPG7
Physical cores4
Sockets1
Processor moduleeSCM
Clock range3.0 to 3.9 GHz
Maximum CPW111,300
IBM i software tierP05
Operating systemsIBM i, AIX, Linux, and VIOS
ChassisTower or half-wide 2U rack
Cache per core2 MB L2; 8 MB L3

S1012 EPG7 4-core IBM i capacity

S1012 EPG7 4-core IBM i capacity
IBM iConfiguration
Maximum CPW111,300
Software tierP05

This rating comes from our S1012 processor page. The S1012 model overview lists a different figure; we confirm the rating with your quote.

S1012 EPG7 4-core CPW per core

CPW per core is the CPW rating divided by the cores that deliver it. IBM i is licensed by core, so this number shows how much IBM i work you get from each licensed core. Use it to compare processors, and use total CPW to size the whole workload.

S1012 EPG7 4-core CPW per core
ConfigurationCores countedCPWCPW per core
EPG7 4-coreAll 4 cores111,30027,825

S1012 EPG7 4-core AIX performance (rPerf)

rPerf is the relative performance rating for AIX workloads. ST is single-thread. SMT2, SMT4, and SMT8 show the rating with two, four, or eight hardware threads running on each core.

S1012 EPG7 4-core AIX rPerf by thread mode
ConfigurationSTSMT2SMT4SMT8
EPG7 4-core38.876.7105.3130.4

S1012 memory and storage

S1012 EPG7 4-core memory and storage
SpecificationConfiguration
Maximum memory64 GB
ISDIMM featuresEMBN 32 GB (2 x 16 GB); EMBW 64 GB (2 x 32 GB); EMBY 128 GB (2 x 64 GB); 3200 MHz DDR4
SlotsFour ISDIMM slots; industry-standard DIMMs supported
Bandwidth102 GBps peak per socket
Maximum internal storage6.4 TB
Internal NVMeFour 15 mm U.2 bays with concurrent maintenance
Storage expansionNo SAS or NVMe drawers; use Fibre Channel or Ethernet SAN, plus an optional RDX device on USB 3.0

Storage maxima are raw capacity, not usable capacity after mirroring or other protection.

S1012 I/O and physical specifications

S1012 I/O and chassis
SpecificationConfiguration
PCIe slotsTwo x16 Gen4 or x8 Gen5 slots; two x8 Gen5 slots; half-height, half-length
ManagementeBMC with one 1 GbE HMC port
Power and coolingRedundant AC power supplies and cooling
Rack version8.75 x 28.1 x 3.25 in. (W x D x H); 45 lb; 2U half-wide
Tower version8.2 x 31.5 x 16.2 in. (W x D x H); 54 lb
WarrantyThree years

S1012 availability and security

  • Transparent memory encryption with no added management or performance cost.
  • Matrix Math Accelerator for in-core AI inferencing.
  • Redundant AC power supplies and cooling.

S1012 software requirements

S1012 software requirements
SoftwareLevels
IBM i7.5 TR4 or later; 7.4 TR10 or later.
AIX with any I/O7.3 TL02 SP 7300-02-02-2420; 7.2 TL05 SP 7200-05-08-2420; or 7.3 TL01 SP 7300-01-04-2420, or later.
AIX virtual-I/O-only partitions7.3 TL02 SP 7300-02-01-2346; 7.3 TL01 SP 7300-01-01-2246; 7.2 TL05 SP 7200-05-04-2220; or 7.1 TL05 SP 7100-05-10-2220 with the service extension, or later.
LinuxSLES 15 SP6 or later, including SLES for SAP; RHEL 9.2 for Power LE or later.
Red Hat OpenShiftContainer Platform 4.15 or later.
VIOS4.1.0.21 or 3.1.4.41.

Compare S1012 EPG7 4-core with other S1012 configurations

EPG7 is the only S1012 offered as both a tower and a rack system. EPGZ doubles CPW to 222,600 and memory to 256 GB but moves IBM i to P10 and comes only as a rack system.

S1012 processor configurations
ConfigurationCoresSocketsClock GHzIBM i tierCPWCPW per corerPerf SMT8
EPG3 1-core113.0 to 3.9P0527,82527,825Not listed
EPG7 4-core (this page)413.0 to 3.9P05111,30027,825130.4
EPGZ 8-core813.0 to 3.9P10222,60027,825234.1

The Power 11 S1112 keeps the compact IBM i role. Its EJMT 4-core reaches 117,300 CPW in P05.

All S1012 processor options.

IBM Power 10 S1012 9028-21B EPG7 4-core feature and configuration details

Use these entries to match the chart’s identifiers to their exact configuration. Keep each performance figure with its stated core count, threading mode and model scope.

EPG7 4-core ... 9028-21B

S1012 EPG7 4-core CPW per core

Cores counted
All 4 cores
CPW
111,300
CPW per core
27,825

S1012 EPG7 4-core AIX rPerf by thread mode

ST
38.8
SMT2
76.7
SMT4
105.3
SMT8
130.4

Understand this configuration and identifier before matching a replacement. Send the complete model and EPG7 4-core entry with your configuration or parts request.

Bandwidth ... 9028-21B

S1012 EPG7 4-core memory and storage

Configuration
102 GBps peak per socket

Understand this configuration and identifier before matching a replacement. Send the complete model and Bandwidth entry with your configuration or parts request.

Maximum internal storage ... 9028-21B

S1012 EPG7 4-core memory and storage

Configuration
6.4 TB

Understand this configuration and identifier before matching a replacement. Send the complete model and Maximum internal storage entry with your configuration or parts request.

EPG7 4-core (this page) ... 9028-21B

S1012 processor configurations

Cores
4
Sockets
1
Clock GHz
3.0 to 3.9
IBM i tier
P05
CPW
111,300
CPW per core
27,825
rPerf SMT8
130.4

Understand this configuration and identifier before matching a replacement. Send the complete model and EPG7 4-core (this page) entry with your configuration or parts request.

Request a S1012 EPG7 4-core quote

Send us your partition layout, operating-system releases, and required memory. Include usable storage capacity, the adapters you need, and your target CPW.

For an MES upgrade or a move to Power 11, include your current machine type, model, and serial number.

We can include the services needed to bring the configured system into production:

  • Installation and operating-system upgrades.
  • Data migration and PTF updates.
  • Ongoing maintenance and support.
Request a configuration quote