AS400 to IBM Power 11 Partners
(888) 682-5335

Power 10 Linux upgrades by current model

What can your Power 10 Linux system move to?

Compare OS and capacity changes for your Power 10 Linux workload. Start with the exact model and installed release so Midland can scope an upgrade or a suitable replacement.

Your current Power 10 model and Linux workload

Power 10 meets the processor baseline for RHEL 10 and SLES 16. Exact model support, release level and virtualization requirements still apply; a generation-wide CPU baseline is not a complete certification.

Choose the exact catalog identity below for its planning notes. The list identifies assessment starting points; eligibility still depends on the installed edition and configuration.

Power 10 Linux model planning
Current modelConfiguration question
E1050 9043-MRXSize each partition and its storage connections
E1080 9080-HEXSize each partition and its storage connections
L1022 9786-22HCheck the workload allocation and certification
L1024 9786-42HCheck the workload allocation and certification
S1012 9028-21BMatch the capacity change to the actual bottleneck
S1014 9105-41BMatch the capacity change to the actual bottleneck
S1022 9105-22AMatch the capacity change to the actual bottleneck
S1022s 9105-22BMatch the capacity change to the actual bottleneck
S1024 9105-42AMatch the capacity change to the actual bottleneck

E1050 9043-MRX: size each partition and its storage connections

Capture the busy periods and resource allocation for each logical partition. Review external storage, multipath software and management-console levels. A consolidation plan must retain the isolation and recovery behavior the applications need.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review E1050 9043-MRX and E1150 9043-MRU. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

E1050 9043-MRX catalog details · Choose the installed-release branch · Prepare the migration inventory

E1080 9080-HEX: size each partition and its storage connections

Capture the busy periods and resource allocation for each logical partition. Review external storage, multipath software and management-console levels. A consolidation plan must retain the isolation and recovery behavior the applications need.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review E1050 9043-MRX and E1150 9043-MRU. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

E1080 9080-HEX catalog details · Choose the installed-release branch · Prepare the migration inventory

L1022 9786-22H: check the workload allocation and certification

Keep model-specific allocation limits beside the applications that use the server. For SAP or other certified software, confirm the exact application, database and OS combination. A compatible Linux or AIX kernel is only one part of that check.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review L1022 9786-22H and L1122 9856-22H. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

L1022 9786-22H catalog details · Choose the installed-release branch · Prepare the migration inventory

L1024 9786-42H: check the workload allocation and certification

Keep model-specific allocation limits beside the applications that use the server. For SAP or other certified software, confirm the exact application, database and OS combination. A compatible Linux or AIX kernel is only one part of that check.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review L1022 9786-22H and L1122 9856-22H. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

L1024 9786-42H catalog details · Choose the installed-release branch · Prepare the migration inventory

S1012 9028-21B: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review L1022 9786-22H and L1122 9856-22H. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

S1012 9028-21B catalog details · Choose the installed-release branch · Prepare the migration inventory

S1014 9105-41B: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review L1022 9786-22H and L1122 9856-22H. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

S1014 9105-41B catalog details · Choose the installed-release branch · Prepare the migration inventory

S1022 9105-22A: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review L1022 9786-22H and L1122 9856-22H. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

S1022 9105-22A catalog details · Choose the installed-release branch · Prepare the migration inventory

S1022s 9105-22B: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review L1022 9786-22H and L1122 9856-22H. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

S1022s 9105-22B catalog details · Choose the installed-release branch · Prepare the migration inventory

S1024 9105-42A: match the capacity change to the actual bottleneck

Compare processor use, memory pressure and storage response before choosing an upgrade. Record the installed processor feature and attached devices so the quote addresses the current workload rather than the model’s maximum specification.

Record the distribution’s full release and the output of uname -m. Then match the package architecture and boot arrangement to the Power Linux architecture guide.

For a replacement comparison, review L1022 9786-22H and L1122 9856-22H. Size and qualify the proposed configuration against this workload; these are candidates rather than guaranteed equivalents.

S1024 9105-42A catalog details · Choose the installed-release branch · Prepare the migration inventory

Your installed Linux release on Power 10

Compare a supported distribution upgrade with a rebuild or hardware move. Check the SAP or other application certification separately from the base operating system.

Power 10: Linux release starting points
Installed release or architecturePlanning next step
RHEL 8Review the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.
RHEL 9Review the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.
RHEL 10Review the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.
SLES 15Review the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.
SLES 16Review the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.
Ubuntu LTSReview the exact source release and hardware requirements before selecting the target. This branch is an assessment topic, not confirmation that every listed model runs the release.

Find the installed release information.

Upgrade Linux or add capacity on Power 10

Start with the application result you need. A supported OS change can keep the existing server useful; a capacity change can address resource pressure. Neither establishes a supported release on hardware the vendor excludes.

Migration from your Power 10 Linux system

Moving to another server is a separate task from updating the OS. The plan must qualify the destination, transfer the workload and prove the application works before the final switch.

  1. Record the source configuration.
  2. Choose a compatible transfer method.
  3. Rehearse application recovery and acceptance.
  4. Agree the rollback decision before new production transactions begin.

Return to Linux upgrades · Plan the Linux migration

Sources and release checks

Guidance checked October 21, 2026. Midland catalog identities stay with their exact model. Hardware eligibility, software maintenance and application certification need separate checks for the installed configuration.